Q & Answer -- What is the importance of Pink book in railway working ?

Q. - What is the importance of Pink book in railway working.

Ans.- Importance of Pink Book  :-              

This shows the various sub heads under which the lum sum amount sanctioned by allotment is to be spent and this indicates the works for which the allotment of money is intended. These books are furnished to the Railways along with budget orders.

The Pink Books also show in the case of work costing over one lack each , total estimated cost of each work and railway administration are required to exercise control over expenditure not only against the allotment sanctioned for the year for each work but also against its total estimated cost as shown in Pink Book  for works costing less than one lack rupees each a lum sum is allotted to each Railway administrations in Pink Book.  


The "Pink Book" refers to the Indian Railway Permanent Way Manual, which is a comprehensive guidebook for the construction, maintenance, and operation of railway tracks in India. It is an essential document that lays down the standards and procedures to be followed in the planning, design, construction, and maintenance of railway tracks.

The Pink Book provides detailed information on various aspects of railway track engineering, including track alignment, superstructure, substructure, drainage, ballast, and maintenance. It also covers important topics like track geometry, speed restrictions, signalling and interlocking, and safety measures to be taken to prevent accidents.

Railway tracks are an integral part of the transportation system, and their proper functioning is crucial for the safe and efficient operation of trains. The Pink Book serves as a guidebook for railway engineers, technicians, and maintenance personnel, providing them with the necessary information to maintain and improve the quality of railway tracks.

The importance of the Pink Book in railway working cannot be overstated, as it provides a standardized approach to railway track engineering and maintenance, ensuring the safety and reliability of the railway system.


ALSO SEE

.

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

Labels

Short Notes (25) Question Bank (17) Account & Finance (15) FINANCIAL RULES (13) Question & Answer (7) Functions of Accounts Department (3) STATION BALANCE SHEET (3) H.07 लेखा निरीक्षण (2) INDEX (2) RAILWAY BUDGET (2) 0 FINANCIAL RULES SYLLABUS (1) 1. RAILWAY BUDGET (1) 2. Rules of Allocation (1) 3. INVESTMENT PLANNING AND WORKS BUDGET (1) 5. STATION OUTSTANDING. (1) 6.0 RAILWAY BUDGET (Short Note) (1) 6.1 Cannons/Standards of Financial Propriety (1) 6.10 CONTROL OVER EXPENDITURE (1) 6.2 Consolidated Fund Of India (1) 6.4 RULES OF RE-APPROPRIATION (1) 6.7 AUGUST REVIEW (1) 6.9 APPROPRIATION ACCOUNT (1) 8.1 निविदा (Tender) (1) Account (1) Accounts (1) Audit & Audit Report (1) BOT / BOOT Schemes (1) CONTINGENCY FUND OF INDIA (1) Contract & Its Types (1) Earnest Money (1) FINAL MODIFICATION (1) H 1 रेलवे टेंडर सिस्टम (Railway Tender System) (1) H.01 रेलवे का इतिहास एवं संगठन (1) H.01.1रेलवे की परिभाषा और प्रबंध की संरचना (1) H.02 लेखा एवं वित्त (1) H.03 रेल लेखा की संकल्पना (1) H.04 रेल बजट (1) H.05 वित्त एवं व्यय पर नियंत्रण (1) H.06 सांविधिक लेखा - परीक्षा (1) H.08 सामान्य व्यय (1) H.09 कारखाना लेखा (1) H.10 भंडार लेखा (1) H.11 यातायात लेखा (1) H.12 रेलवे यातायात (1) H2. 19 बजट आदेश (Budget Order) / बजट आबंटन (Budget Allotment) में अन्तर (1) H2.01 Revised Estimate/Details Estimate में अंतर (1) H2.02 Abstract Estimate / Details Estimate में अंतर (1) H2.03 Revised Estimate / Supplementary Estimate में अंतर (1) H2.04 Completion Estimate / Completion Report में अंतर (1) H2.05 Delay Tender / Late Tender में अन्तर (1) H2.06 Single Tender / Single offer में अंतर (1) H2.07 ओपन टेंडर / लिमिटेड टेंडर में अंतर (1) H2.08. Earnest Money Deposit / Security Deposit में अन्तर (1) H2.09 Security Deposit / Performance Guarantee में अन्तर (1) H2.10 Deposit Miscellaneous / Miscellaneous Advance में अंतर (1) H2.11 On Account Bill / Final Bill में अंतर (1) H2.12 Rate Contract / Running Contract में अंतर (1) H2.13 Demand Payable / Demand Recoverable में अन्तर (1) H2.14 General Books / Subsidiary Books में अंतर (1) H2.15 Consolidated Fund समेकित निधि / Contingency Fund आकस्मिक में अंतर (1) H2.16 मूल्यह्रास संचय कोष (Depreciation Reserve Fund) / विकास कोष (Development Fund) में अन्तर (1) H2.17 Draft Para / Audit Para में अन्तर (1) H2.18 Traffic (Gross) Earning / Traffic (Gross) Receipt में अन्तर (1) H2.20 स्वीकृत व्यय (वोटेड Expenditure) / प्रभ्रत व्यय (Charged Expenditure) में अन्तर (1) H2.21 Estimate Committee / Public Committee में अन्तर (1) H2.22 Public Committee / Railway Convention committee में अन्तर (1) H2.23 Remittance Transaction / Transfer Transaction में अन्तर (1) H2.24 Stock Item / Non-Stock Items में अन्तर (1) H2.25 Co6 / Co7 में अंतर (1) H2.26 TC / JV में अन्तर (1) H8.2 परिचालन अनुपात (1) H8.3 वित्तीय औचित्य (1) H8.4 सर्वेक्षण (1) Letter of credit (1) Limited Tender (1) Local Purchase (1) Open Tender (1) REVISED AND DETAIL ESTIMATE में अंतर (1) Security Deposit (1) Single Tender (1) Special Limited Tender (1) Tender Committee (1) Tender Notice & Tender Documents (1) Traffic Earnings (1) Work Contracts (1) Zero Base Budget. (1) यातायात लेखा विभाग के कार्य (1)